7.96km / 25:02 / 52m / 18.3°C
Haha! Not this morning mr truck driver, I can see you rolling straight through that Give Way sign and I’ll not let you drive over me. I’ll just stop and stand here giving you the slow hand clap. You’ll have to try again tomorrow. Browns road, Clayton, again….
The new signalling on the Dandenong line is in operation now, the trains now run every ten minutes. Great for train commuters, not so good for the cyclists, since in their infinite wisdom the Level Crossing Removal Authority installed a level crossing on the bike path in Clayton, and most riders also use the pedestrian crossing in Hughesdale. Long waits at both crossings this morning, I suspect I’ll end up abandoning the Djerring trail to use Carinish road
Moderate rain, 19°C, Feels like 19°C, Humidity 84%, Wind 1m/s from ENE - by Klimat.app
Riding 796th day in a row, including my and astoundingly, all of 2021.
Garmin / Strava / ridewithgps