5.04 ㎞ / 17:57 / 48 m / 8.0 ℃
The full raincoat, sandals, and slow down to plow through the larger lakes. One day bike paths will be built with camber, and drainage…
Turned off at Huntingdale Station and took the short route, it gets to work quicker, and avoids the largest of the lakes – installed by the LXRA in 2018 when they rebuilt the path and turned it into the Djerring Trail. There’s now a permanent “temporary warning sign” telling everyone “Watch Your Step”, but no sign that they’re ever intending to fix the problem they created
Light rain, 9°C, Feels like 5°C, Humidity 90%, Wind 6m/s from N - by Klimat
Garmin / Strava / ridewithgps
